.jpeg)
Our Projects
Diyarbakır - Dicle Bridge and Access Roads
Project Scope: Approximately Km: 25+506 – Km: 27+272 section of Ergani – Dicle Road
Project Objective: Construction of the new bridge and the access roads as alternatives to the roads and bridges that will be covered under the tail waters of Dicle H.E.S.
Technical Details Bridge
Length : 240 m
Highest foot : 37,07 m
Reinforcement concrete : 7.133 m3
Construction iron : 1.134 ton
Steel beams with high body : 1.202 ton
Access Roads
Length : 1.480 m
Amount of excavation : 134.850 m2

Rize - Dündoğdu & Ketenislah Group Bridges
In this project consisting of 4 groups of bridges (146m) constructed within Rize Province, 2200m3 concrete, 400 tons of iron, 1400m cast in-place piles, and 1500 tons of Pre-Stressed Prefabricated Beams were used.
Technical Details
Total Bridges : 4
Total Foot : 11
Min. Foot Height : 12,75 m
Max. Ayak Height : 18,60 m
Contract Date : Dec. 1995
Completion Date : Dec. 1997

Siirt - Eruh
Since the existing Siirt - Eruh road will be covered by the tail waters of Ilısu Dam planned to be constructed on Dicle River; this project was studied as an alternative passage and was planned as the new course.
Construction of this project with a total length of 53 Km. was commenced in 1998, and till today, manufacturing of 29.000 m3 concrete, manufacturing of 1800 m cast in-place piles, 50.000 m3 masonry walls, and 2.600.000 m3 earthworks have been performed on this road.
In addition, Botan Bridge with steel beams in the superstructure, length 350m, span 50m, and foot height 40m is also included in the scope of this project.
Technical Details
Length : 53 km

Mosul - Iraq
Ministry of Water Resources of the Republic of Iraq.

Malatya - Doğanyol & Arguvan Projects
These projects, designed for collection of water from dams through electro-pumping system, consist of a platform sitting on cast-in-place piles on the dam lake with a depth of approximately 25m, and it has a closed area of about 300 square meters and height about 7,5m. It consists of a single-floor hangar and a pumping building. In addition, a road with cast-in-place piles with a length about 600-700m has been constructed with the purpose of providing access to dam lake. Three projects of this type has been completed in various dates.
Construction Of Water Collection Plan Through Electro-Pumping System For Malatya- Arguvan - Narmikan - Parçikan Construction Of Water Collection Plan Through Electro-Pumping System For - Malatya - Doğanyol I - Merkez - Koldere Construction Of Water Collection Plan Through Electro-Pumping System For - Malatya - Doğanyol Ii- Merkez - Koldere

Istanbul - Bayrampaşa Municipality and Shopping Center
The complex consisting of a business center with a closed area of 47.000 square meters and service building of Municipality on the property of Bayrampaşa Municipality has been completed and opened to service in the year 2000. It is located within the center of Bayrampaşa, which is one of the most frequented and busy units of Turkey.
All kinds of safety measures against earthquake have been taken in the building, and no concessions have been made as regards quality till its completion. Facing of the façade is made from Spanish granite, and has glass curtail walls throughout the façade. There is a parking place with 3 floors and a parking capacity of 500 vehicles under the shopping center, which is a building with 5 floors.
Technical Details
Total Construction Area : 53.000 m2
Parking Area : 500 vehicle
Start Date : 1997
Completion Date : 2000
Employer : Bayrampasa Municipality

Ankara - Pozantı

Siirt - Eruh

Istanbul - Pendik Dockyard

Erzurum - İmranlı

Dicle Bridge

Istanbul - Bayrampaşa Municipality and Shopping Center

